STS-45
| Mission Insignia | |
|---|---|
| Mission Statistics | |
| Mission: | STS-45 |
| Shuttle: | Atlantis |
| Launch Pad: | 39-A |
| Launch: | March 24, l992, 8:13 a.m. EST. |
| Landing: | April 2, 1992, 6:23 a.m. EST, Runway 33, Kennedy Space Center. |
| Duration: | 8 days, 22 hours, 9 minutes 28 seconds. |
| Orbit Altitude: | 160 nautical miles (296 km) |
| Orbit Inclination: | 57.0 degrees |
| Distance traveled: | 3,238,177 miles (5,211,340 km) |
| Crew photo | |
| Table of contents |
|
2 Mission Parameters 3 Mission Highlights 4 Related articles 5 External links |
Carried first Atmospheric Laboratory for Applications and Science (ATLAS-1) on Spacelab pallets mounted in orbiter's cargo bay. The non-deployable payload, equipped with l2 instruments from the U.S., France, Germany, Belgium, Switzerland, The Netherlands and Japan, conducted studies in atmospheric chemistry, solar radiation, space plasma physics and ultraviolet astronomy. ATLAS-1 instruments were: Atmospheric Trace Molecule Spectroscopy (ATMOS); Grille Spectrometer; Millimeter Wave Atmospheric Sounder (MAS); Imaging Spectrometric Observatory (ISO); Atmospheric Lyman-Alpha Emissions (ALAE); Atmospheric Emissions Photometric Imager (AEPI); Space Experiments with Particle Accelerators (SEPAC); Active Cavity Radiometer (ACR); Measurement of Solar Constant (SOLCON); Solar Spectrum (SOLSPEC); Solar Ultraviolet Spectral Irradiance Monitor (SUSIM); and Far Ultraviolet Space Telescope (FAUST). Other payloads included Shuttle Solar Backscatter Ultraviolet (SSBUV) experiment, one Get Away Special (GAS) experiment and six mid-deck experiments.
Landing: April 2, 1992, 6:23 a.m. EST, Runway 33, Kennedy Space Center. Rollout distance 9,227 feet. Mission extended one day to continue science experiments. Landing Weight: 205,042 lbs.
Crew
Mission Parameters
Mission Highlights
Launch: March 24, l992, 8:13 a.m. EST. Launch originally scheduled for March 23, but was delayed one day because of higher the allowable concentrations of liquid hydrogen and liquid oxygen in the orbiter's aft compartment during tanking operations. During troubleshooting, the leaks could not be reproduced, leading engineers to believe that they were the result of plumbing in the main propulsion system not thermally conditioned to the super cold propellants. Launch was rescheduled for March 24. Launch Weight: 233,650 lbs. Related articles
External links
Previous Mission:
STS-42Space Shuttle program
Next Mission:
STS-49